Copenhagen Metro, Phase 3 – ’Østamagerbanen’

Elaboration of geotechnical basis for design of railway embankments with reinforced soil. Review of Contractors ground anchor design and basis for design of the deep through at Øresundsvej. Review of pile driving results for piles supporting the piers for the Crossing at Øresunds highway and Railway. Settlement analysis for pier foundations for the bridge at Øresund highway.

Location: Denmark, København

Client: Metro BYG

Year: 2004

Assessment of settlementsBridgesDesign basisGround anchorsRoads and railwaysSupervision