Soil evaluation and preliminary design of piles and footings for the foundation of a Flue Gas Desulphurisation Plant comprising of: a new chimney, absorber, dump tanks, electrical building, NaOH silo, wastewater buffer tanks, wash filtrate tank, limestone silo, gypsum storage (steel-frames and base slab).
UK, Ferrybridge Power Station
Location: UK
Client: Monberg & Thorsen A/S, MT International
Year: 2000
Foundation designInternational geotechnical workPile foundations